Homebuilding: Raising Walls

by admin

Homebuilding: Raising Walls
By Mike Merisko

You ve just taken some plywood, 2×4 studs, 2×12 header material and some house wrap and transformed them into a wall. Its time to take the fruits of your labor and raise that wall off the deck. Having the right steps in place and making the right moves will make this task go smoothly and safely.

There are a couple of procedures that are done during the framing of the wall that play an important part in raising it. Before an exterior wall is framed, a chalk line is snapped on the deck. If it is a 2×4 wall with 1/2″ sheathing, this line will be 4 inches off the edge of the deck. After the wall is framed and before any wall sheathing is nailed to it, the edge of the bottom plate is brought to the line. The end of the wall is brought to the edge of the deck. Once the frame is put in place, it is toe nailed with 8d nails on the inside of the bottom plate. Not only do these hold the wall in place when squaring up the wall, but also keep the wall on the line when raising it.

Once the wall is sheathed with plywood, insulation board, foam board and covered with house wrap you are ready to raise it. In preparation to lift the wall one must be able to get their hands under the top plate. Using a straight claw hammer or a prybar under the top plate, lift the wall high enough to slip a 2×4 flat under it. This inch and a half space gives you enough room for your hands.

If your raising a second story wall it is a good idea to nail stopping blocks to the rim joists. One of the last things you want is the wall being pushed off the edge of the deck. These are scrap pieces of lumber nailed the rim joist with 16d nails. Ideally these should be 16 to 18 inches long and nailed the full width of the joist with 4 16d nails. The balance of the board will stick up above the deck. Put these blocks at each end of the wall. On longer walls you may want to add one to the middle.

Before raising the wall, have all of your bracing material on hand. On a windy day you will want to brace the wall in place as soon as possible. Have enough braces (2×4 s) to have them nailed on about every 10 feet. You will need blocks to nail to the deck to anchor the braces. These need to be about 20″ long and get nailed to the deck through the plywood and into the floor joists with 16d nails. The nails need to go into the joists or there is the risk of the bracing failing in the case of high winds.

Bracing on the ends of the walls can be nailed on before it is raised. Nail one end of a 2×4 (wall stud) about one third of the way down from the top plate, again using 16d nails. Start a nail at the other end of the 2×4 so when the wall is stood up, all one has to do is drive the nail into the rim joist to brace the end of the wall.

With all materials and safeguards in place you can now raise the wall. A good rule of thumb for raising a wall is a set of hands every 8 to 10 feet. This gives everyone a comfortable weight to lift. To save your back, use your legs in the lifting process as much as possible.

Once the wall is raised, nail off the end braces to the rim joists. Next, nail the braces to a stud or window opening about a third of the way down from the top plate, about every 8 to 10 feet apart. Next, nail the blocks to the deck alongside the braces that were just nailed the the wall, being sure to catch the floor joists with the nails. With the wall as close to plumb as possible, nail off the anchor end of the brace to the block on the deck. It is important to use 16d nails for all of these steps.

After the wall is raised and braced, the final step is to nail the bottom plate of the wall to the deck. Push or pull the wall to the chalk line that was snapped on the deck. The 8d toe nails and the stopping blocks should have kept the wall very close to this line.

Low Budget, No Budget Decorating
Low Budget, No Budget DecoratingBy Nanette Catarinella Whether building a new home or remodeling a current home, most budgets can only stretch ...

Chimney Drafting Problems and Solutions
Chimney Drafting Problems and SolutionsBy David W Miller No two fireplaces are alike when it comes to smoking chimneys. There are many factors ...

Building By The Square Foot
Building By The Square FootBy Mike Merisko How much material is it going to take to do the job? What is the labor cost for the project? These ...

A Guide to Successful Flower Gardening
A Guide to Successful Flower Gardening By Manny Cantones Flower gardening is no longer a new concept. It s been around for many years and cultivat...

Basement Foundation Repair
Basement Foundation RepairBy Ken Marlborough The most common type of structural foundation damage in the basement is due to damage caused by wa...

You can now walk away and start another wall.

Remember, homebuilding can be a dangerous and risky occupation or activity. Always exercise caution and safety in all aspects of the construction process.

Mike Merisko (C) 2006

www.sawkerfs.com

About the Author: Mike Merisko has been a carpenter for 27 years. Most of those years were spent in the homebuilding and remodeling industries. He was also in business as a carpentry and general contractor. While that is his forte, he also has experience in bridge building, commercial construction, and exhibit building which is how he earns his living these days. You can browse through articles by him and others at his website http://www.sawkerfs.com or visit his blog at http://www.sawkerfs.blogspot.com

Article Source: http://EzineArticles.com/?expert=Mike_Merisko
http://EzineArticles.com/?Homebuilding:-Raising-Walls&id=290579


Sphere: Related Content

.

Leave a Reply